REHABILITATION CENTER FOR CHILDREN IN ALMATY - Kazakhstan

At the end of 1993, Bobek Foundation from Almaty announced a bid for the construction of a rehabilitation center for the children of Kazakhstan and the contract type was design and build. Fintraco Construction Company participated the bid with our design and became the successful bidder. The land was a corner plot located next to a forest at the east, with a beautiful mountain view at the south direction and the total area was 22 hectars.

Children between the ages 5 to 14 will be accepted to the center and 5 to 8 can accommodate in the hospital with a parent if they want. For the parents of elder groups a hotel has been designed as a separate building next to the main entrance of the area. During the preliminary design of the bidding stage, Dr. Sururi Özkiliç from Or-Nö-Ram consulted our project. The design has been developed in 6 different building groups and the major program elements includes:

  • 216 bed inpatient rooms
  • Physiotherapy and hydrotherapy facilities
  • Diagnostic department
  • Methodology center
  • Indoor swimming pool and multy purpose hall
  • Art and music classrooms
  • Retaurant, cafeteria and cinema
  • Indoor playing areas
  • 40 bed parents hotel
  • Outdoor sports facilities
  • Manager villas and staff apartments
  • Technical buildings and warehouses
Client Bobek Foundation
Contractor Fintraco Insaat ve Taahhüt A.S.
Design completion 1994
Total constraction area 25,105 m2